- Senate cloture on the permitting bill's motion to proceed: 73-25 (Nov 9); final passage not yet voted. U.S. Senate roll call vote 257, Nov 9
- Completed data-center ballot measures: 44 of 45 approved more limits or moratoriums (Redbud). U.S. News, data-center ballot results (Redbud), Nov 10
- NAHB Multifamily Production Index Q3 2026: 41, down 5 points y/y. NAHB Multifamily Market Survey, Q3 2026 (Nov 5)
- U.S. AEC firms running AI in production: 28%; 7% across core workflows (survey July 2026). Construction Briefing, Bluebeam AI survey, Nov 2
- ABC backlog September 2026: 8.7 months; 11.3 months for firms with data-center work. Construction Dive, ABC and AGC reports, Nov 6
- Construction input prices September 2026: +11.2% y/y (ABC read of BLS PPI). Construction Dive, ABC and AGC reports, Nov 6
- SOFR 3.88% (Nov 9), versus 3.93% a year earlier. NY Fed SOFR via FRED, Nov 9
- 10-yr Treasury 4.86% (Nov 6), +75 bp y/y. 10-yr Treasury via FRED, Nov 6
Get the daily briefing free. Go Pro for the archive.
This recap stays free to read. Subscribe free for the weekday briefing and last week’s Deep Dive. Pro ($99/month or $999/year) unlocks the PDF of this and every past daily issue, the data and the full Deep Dive archive.
This issue's PDF (Pro) · See the Deep Dive · Today's PDF (free)
Executive snapshot
- Neutral Permitting bill cleared its first Senate gate: cloture on the motion to proceed passed 73-25 on November 9. Editorial: this opens debate; it is not passage, and the House has not acted. Politico, Senate advances permitting bill, Nov 9
- Deteriorating Voters kept limiting data centers: in 44 of 45 completed local ballot measures this fall, voters approved more restrictions or moratoriums, per Redbud Consulting. Editorial: local zoning risk now sits beside power risk. U.S. News, data-center ballot results (Redbud), Nov 10
- Deteriorating Ottawa, Kansas adopted a 10-year pause: voters approved a data-center moratorium by just over 70%. Editorial: land teams should treat small-city sites as vote-exposed. KMBC, Ottawa KS moratorium vote, Nov 10
- Deteriorating Multifamily developers turned more negative: NAHB's Production Index was 41 in Q3 2026, down 5 points y/y, with all four components below 50. Editorial: expect thinner 2027 apartment bid lists. NAHB Multifamily Market Survey, Q3 2026 (Nov 5)
- Neutral AI is still mostly in pilots: 28% of U.S. AEC firms run AI in production and 32% are piloting (Bluebeam survey, July 2026). Editorial: estimating and precon are where firms report results first. Construction Briefing, Bluebeam AI survey, Nov 2
- Positive Dozers now record their own as-builts: Sodex launched SDX-AutoScan, a cab-mounted lidar that uses Trimble Earthworks positioning to log daily surfaces with no operator input. Editorial: faster quantity proof for earthwork pay apps. The American Surveyor, Sodex SDX-AutoScan, Nov 5
- Cautious Backlog held while confidence slipped: ABC backlog was 8.7 months in September, and more than a quarter of contractors expect margins to shrink. Editorial: price escalation risk into new bids. Construction Dive, ABC and AGC reports, Nov 6
- Cautious Power gear is still the long pole: panelists cited transformer lead times of up to three years and 12 to 18 months for chillers, switchgear and UPS (Directional, panel remarks). Editorial: release electrical packages before design is final. Bisnow, data-center supply chains, Nov 8
- Neutral Cost of money: SOFR was 3.88% on November 9 and the 10-yr Treasury 4.86% on November 6. Editorial: floating-rate carry is flat y/y, while permanent takeout costs more. NY Fed SOFR via FRED, Nov 9
Market movers
| Item | Change | Note |
|---|---|---|
| Senate permitting cloture vote | 73-25, Nov 9 ▲ | Motion to proceed only; final votes pending. U.S. Senate roll call vote 257, Nov 9 |
| Data-center ballot measures | 44 of 45 for limits ▼ | Completed counts, fall 2026 (Redbud). U.S. News, data-center ballot results (Redbud), Nov 10 |
| NAHB Multifamily Production Index | 41, -5 pts y/y, Q3 2026 ▼ | All four components below 50. NAHB Multifamily Market Survey, Q3 2026 (Nov 5) |
| NAHB Multifamily Occupancy Index | 69, -5 pts y/y, Q3 2026 ▼ | Still above 50; mid/high-rise 59. NAHB Multifamily Market Survey, Q3 2026 (Nov 5) |
| ABC backlog | 8.7 months, Sep 2026 ▲ | Second monthly increase. Construction Dive, ABC and AGC reports, Nov 6 |
| NAHB MF garden/low-rise production | 46, -5 pts y/y, Q3 2026 ▼ | Half the index weight; now below 50. NAHB Multifamily Market Survey, Q3 2026 (Nov 5) |
Sector outlooks
| Sector | Outlook | Signal |
|---|---|---|
| Data centers | Cautious | Voters approved limits in 44 of 45 completed local measures; Senate advanced the permitting bill 73-25 on cloture. U.S. News, data-center ballot results (Redbud), Nov 10 |
| Industrial / logistics | Cautious | September manufacturing spending $170.2B SAAR, -17.0% y/y; warehouse planning weakened in October (Dodge). Census C30, September 2026 (released Nov 2) |
| Public / infrastructure | Positive | September highway and street spending $150.9B SAAR, +3.9% y/y. Census C30, September 2026 (released Nov 2) |
| Power | Positive | September power construction spending $191.7B SAAR, +11.1% y/y; transformer waits up to three years cited Nov 8. Census C30, September 2026 (released Nov 2) |
| Multifamily | Deteriorating | NAHB Production Index 41 in Q3 2026, -5 y/y; September 5+ unit starts 349k SAAR, -25.9% y/y. NAHB Multifamily Market Survey, Q3 2026 (Nov 5) |
| Single-family | Cautious | September single-family starts 859k SAAR, +2.6% y/y; 30-year rate 7.18% (Nov 5). Census new residential construction, September 2026 |
| Healthcare | Neutral | September health care spending $76.5B SAAR, +0.4% y/y; healthcare planning accelerated in October (Dodge). Census C30, September 2026 (released Nov 2) |
Teach Me
Machine-captured as-builts for earthwork pay apps
Editorial method: a machine-captured as-built is a dated 3D surface recorded by sensors on a dozer, excavator or drone during normal work. Comparing today's surface to the last one and to the design model gives cut and fill quantities without a separate walkover survey.
Why it matters. Sodex's new SDX-AutoScan logs daily dozer surfaces using the Trimble Earthworks positioning already on the machine, and the maker says it speeds billing cycles and finds deviations from quoted volumes sooner. Dated surfaces turn quantity disputes into a comparison of records. The American Surveyor, Sodex SDX-AutoScan, Nov 5
- Pick one active earthwork job and list which machines already carry GNSS machine control.
- Set a capture rule: one dated surface per shift from machines or a drone flight, stored in one shared project folder.
- Agree with the owner or GC in writing which surface and which design model will support each monthly pay app.
- Run cut and fill quantities from the surfaces weekly and compare them with foreman tickets and the schedule of values.
- Flag any area where captured volume differs from quoted volume by more than your threshold and send it to the PM before billing.
You are my earthwork project controls analyst. Using the attached weekly cut and fill quantities from machine-captured surfaces, the schedule of values and foreman tickets, build a table by area showing quoted volume, captured volume to date, ticketed volume, percent complete and variance. Flag variances over 5%, list likely causes, and draft a short note to the GC supporting this month's pay app.
Strategic watchlist
- Senate final votes on the permitting bill (S. 5653 on the H.R. 2347 vehicle) after amendments. Editorial: transmission and pipeline pursuits move only if the House also acts before the session ends. Politico, Senate advances permitting bill, Nov 9
- Minneapolis council votes November 12 on data-center rules before its six-month moratorium expires November 21. Editorial: a rules package, not a ban, would reopen sites with conditions. FOX 9, Minneapolis data-center rules, Nov 9
- Aurora council advanced a ban on tax incentives for future data centers on November 9; a utility-tied application pause is set for the November 23 agenda. Editorial: incentive loss changes pro formas before zoning does. Sentinel Colorado, Aurora tax-incentive ban advances, Nov 10
- Florida regulators rejected Duke Energy Florida's large-load tariff 5-0; Duke must refile. Editorial: Florida data-center power terms stay unsettled until a tariff is approved. WUSF, Florida PSC rejects Duke data-center tariff, Nov 4
- Ohio: voters backed limits in all 18 communities that voted on data-center curbs. Editorial: check local ballot history before tying up land. BG Independent, Ohio data-center ballot results, Nov 10
Top questions leaders should be asking
- Which of our data-center and power pursuits depend on federal permitting changes, and which depend only on local zoning votes?
- Have we checked every land deal against local ballot measures and pending moratorium votes before closing?
- Does our 2027 multifamily pipeline assume starts that NAHB's Production Index of 41 says developers are not ready to make?
- Where are we still piloting AI in estimating, and what would it take to move one workflow into production this quarter?
- Are earthwork pay apps backed by surveyed or machine-captured surfaces, or by foreman estimates?
This is an archived issue.
Read today's live briefing or get the full briefing in your inbox every morning — free.
See today's Pulse → Subscribe freeSources
- U.S. Senate roll call vote 257, Nov 9
- U.S. News, data-center ballot results (Redbud), Nov 10
- NAHB Multifamily Market Survey, Q3 2026 (Nov 5)
- Construction Briefing, Bluebeam AI survey, Nov 2
- The American Surveyor, Sodex SDX-AutoScan, Nov 5
- Bisnow, data-center supply chains, Nov 8
- Construction Dive, ABC and AGC reports, Nov 6
- Asia Business Daily, LH modular orders, Nov 4
- FOX 9, Minneapolis data-center rules, Nov 9
- NY Fed SOFR via FRED, Nov 9